Investing in disruption for survival: GEMINI 1991 to 2023In 1991, the “GEMINI habitable solar power plant” was extremely far ahead of its time, but in 2021, “GEMINI next Generation” has the potential for the next big disruption.![]()
00:07 Consistently increasing more of family income for housing costs. 00:23 First climate conference Rio 1992, so far no near usable results 00:46 No better house, no better solar power plant possible on the same plot 01:11 Real climate protection is only possible with a higher standard of living 01:30 Rate for house minus energy sale, cheaper than a rental apartment 02:30 We also sell houses to minimum pensioners 03:06 Only ClimateProtectionSuperiorityHomes may be built on “Land for Energy” 03:36 Home ownership affordable for the richest 95% of the population. 04:00 Our Vision for COP 46 2041 in Salzburg 05:42 Planetary renovation back to 350 ppm CO2, we contribute house by house 05:59 Housing, energy production and food production space-saving 06:19 The 1000 m² civilization 06:40 -250% CO2 emission until 350 ppm is regained 07:10 1991 Start of the project “GEMINI inhabited solar power plant”. 07:29 1993 to 1994: Lots of honors up to the European Order of Merit, but no money. 07:48 2001 Main attraction of the Styrian State Energy Exhibition 07:26 2011 "Land for Energy" concept introduced to politicians and prefabricated house producers. 08:47 2019 The principles from the “GEMINI next Generation” house are developed, in Unken. 09:24 2020 Components of the technology for the house are purchased for the “Proof of Concept”. 09:40 2021 Videos about the project, environment and significance of the project are produced. 09:58 2021 Search for employees and planning for equipment for the construction hall begins. 11:30 2022 Main work is videos and documentation on every step of production 12:06 2023 Patent 4 and 5 as a surprise at the opening vulture in Unken 12:44 End Music: Andy Mangele https://www.andy-mangele.com/ |
Tweet this: |
Investing in disruption for survival: GEMINI 1991 to 2023: In 1991, the “GEMINI habitable solar power plant” was extremely far ahead of its time, but in 2021, “GEMINI next Generation” has the potential for the next big disruption. https://youtu.be/026cWdwWRlw
Historical development and current statements |
This subdomain Invests.pege.org and the subdomain GEMINIs.pege.org shows the historical development of the project. GEMINI-next-Generation.house shows current statements of GEMINI next Generation AG.